1931 |
Vertical Extension of DTE Building (Sub-Head: Re-Installation of Lifts with floor extension, AC, Networking Systems, Digital Sign Board & Other related works)
pwemw/DTE/2023-24/331/2
|
PWD EM Workshop Division |
02/01/2024 |
15/01/2024
01:00 PM
|
Dhaka |
1932 |
Construction of 5(five) Storied Admin cum Academic Building with 7 storied Foundation including Civil, Sanitary, RCC Road, External Water Supply, Underground Water Reservoir, Rain Water harvesting, Internal Electrification ,200 KVA sub-station, Air Conditioning System, Pump Motor set, Sound System, Solar System, Fire Extinguisher , Compound Security Light and other Ancillary work under the project of "Establishment of Aklima Khatun Textile Vocational Institute at Paikgasa, Khulna.
pwd/khul2/Aklima khatun/Admin cumAcademic/2023-24
|
Executive Engineer PWD Division-02 Khulna |
31/12/2023 |
06/02/2024
12:00 PM
|
Khulna |
1933 |
Improvement work of Dhirganj GC-Dormogar R&H Road via Amgaon, Gadura (Haripur Portion)t Road At 0+00-14+868 Km. (Road ID- 194512004) Upazilla: Haripur , District: THAKURGAON.(Salvage Cost:2019917.00)
APP ID : 196263
|
Executive Engineer ,LGED, Thakurgaon |
31/12/2023 |
01/02/2024
01:00 PM
|
Thakurgaon |
1934 |
Improvement of Lahiri GC-Harinmari GC via Pariahat Road at Ch. 0+000-9+500km [Effective Length=9.50 Km] [Road ID-194082003] under Baliadangi Upazila, District Thakurgaon [Total cost of salvage Material Taka- 24,76,989.00]
APP ID : 196263
|
Executive Engineer ,LGED, Thakurgaon |
01/01/2024 |
01/02/2024
01:00 PM
|
Thakurgaon |
1935 |
Construction of a dual gauge line parallel to the existing meter gauge Line in Dhaka-Narayanganj section project (1st revised ) , Bangladesh Railway, Dhaka
54.01.0000.671.01. 030.23-2155
|
Project Director, Construction of a dual gauge line parallel to the existing meter gauge Line in Dhaka-Narayanganj section project (1st revised ) , Bangladesh Railway, Dhaka |
24/12/2023 |
24/01/2024
12:00 PM
|
Dhaka |
1936 |
18.16.0000.373.01.024(V-07).23-24 /COMC-004
|
Bangladesh Petroleum Corporation (BPC) |
28/12/2023 |
17/01/2024
12:00 PM
|
Chattogram |
1937 |
Design, Supply and Installation of Solar-powered Highway Lighting along the BRT Corridor including the provision of Solar Panels at Bus Stations under Greater Dhaka Sustainable Urban Transport Project (BRT, Gazipur-Airport).
35.01.0000.059.31.007.23-1377
|
Project Director (ACE, RHD), Greater Dhaka Sustainable Urban Transport Project |
28/12/2023 |
14/02/2024
12:00 PM
|
Dhaka |
1938 |
Outsourcing of Support Staff for PMU, UGC
UGC/ICSETEP/Outsourcing/01
|
Project Director, ICSETEP |
27/12/2023 |
10/01/2024
02:00 PM
|
Dhaka |
1939 |
Selection of a Firm for Supplying Manpower Through Outsourcing
56.02.0000.006.07.490.23-847
|
Managing Director ,Bangladesh Hi-Tech Park Authority |
24/12/2023 |
22/01/2024
12:10 PM
|
Dhaka |
1940 |
Construction of Single Storey Academic Building with 4-Storied Foundation in/c. Sanitary, Water Supply & Electrification Works.
37.07.0000.014.20.101.23-2855(13)
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
11/09/2023 |
15/01/2024
12:00 PM
|
Sylhet |