1651 |
Development of existing 7 nos Textile Vocational Institute and Establishment of new 6 nos Textile Vocational Institute (2nd Revised) Project. Sub-Head: Construction of 4 storied Academic Cum Administrative Building with 6-storied foundation including Civil, Internal Sanitary, Internal Electrification, Sub-Station building, Internal Road, Drain and Apron, External water supply and Deep-tubewell, External Electrification and Solar Panel, Boundary Wall, Gate with sentry post, Shahid Minar, Cycle Shed, Arboriculture, Site development at Gouripur Upazila in Mymensingh District.
RDPP/TVI/Gouripur/W-1
|
Mymensingh PWD Division, Mymensingh |
10/01/2024 |
08/02/2024
12:00 PM
|
Mymensingh |
1652 |
Construction of RCC Container yard no-4 at the Laldia char area, Patenga, Chattogram.
18.13.0000.324.07.031.23
|
xen_harbour@cpa.gov.bd |
11/01/2024 |
12/02/2024
01:15 PM
|
Chattogram |
1653 |
01) Improvement of Baliadangi (Dangi)-Horinmary G.C Via Adhardighi hat Road at Ch. 0+000-9+036km [Effective Length=9.036 Km] [Road ID-194082002] under Baliadangi Upazila, District Thakurgaon [Cost of salvage Material Taka- 2,21,824.40] 02) Improvement of Kalomagh G.C-Neckmord Hat Via Bishrampur Road at Ch. 0+000-4+170km [Effective Length=4.17 Km] [Road ID-194082005] under Baliadangi Upazila, District Thakurgaon [Cost of salvage Material Taka- 10,77,540.00] [Total cost of salvage Material Taka- 12,99,364.40]
APP ID : 196263
|
Executive Engineer ,LGED, Thakurgaon |
10/01/2024 |
13/02/2024
12:30 PM
|
Thakurgaon |
1654 |
Improvement of Munshigonj- Asmankhali GC. Ch. 0+000- 8+750 km =8.750km, Upazila: Alamdanga, District: Chuadanga. ( Road ID-218072012), Salvage Cost: Tk.2,502,663.00
Memo No:46.02.0000.931.19.571.23-1775
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Chuadanga |
22/11/2023 |
12/02/2024
12:00 PM
|
Chuadanga |
1655 |
Rent of Inspection Vehicle for DGH Part of Bangladesh Road Safety Project
35.01.2690.078.07.005.24-224
|
Project Director (ACE, RHD) Bangladesh Road Safety Project |
09/01/2024 |
01/02/2024
01:00 PM
|
Dhaka |
1656 |
18.16.0000.373.03.122.24 COMC-02012024
|
BANGLADESH CHEMICAL INDUSTRIES CORPORATION (BCIC) |
09/01/2024 |
14/01/2024
12:15 PM
|
Dhaka |
1657 |
18.16.0000.373.02.204.23 COMC 01012024
|
BANGLADESH AGRICULTURE DEVELOPMENT CORPORATION (BADC) |
09/01/2024 |
14/01/2024
12:00 PM
|
Dhaka |
1658 |
Construction of 50 Bed Isolation Unit & 10 Bed ICU/CCU at M. Abdur Rahim Medical College Hospital, Dinajpur (Lot-1: Civil & Internal Electrification Work at M. Abdur Rahim Medical College Hospital, Dinajpur) Under the Project of COVID-19 Response Emergency Assistance Project. (Vertical Extension of "Emergency or Service Block" 3rd Floor over the Existing Floor).
DINAJPUR/ICU/GOB/WD-1
|
Dinajpur PWD Division |
10/01/2024 |
25/01/2024
12:00 PM
|
Dinajpur |
1659 |
1. Interior Design/Decoration and
2. Digitalization of Mujib100 Museum and Archive
37.26.0000.120.07.23.001
|
Office of the Director General, International Mother Language Institute (IMLI) |
31/12/2023 |
31/01/2024
02:00 PM
|
Dhaka |
1660 |
Vertical Extension of Headquarters Building of Bangladesh Land Port Authority.
18.15.0000.023.07.181.23
|
Superintending Engineer , BLPA |
09/01/2024 |
04/02/2024
02:30 PM
|
Dhaka |