421 |
Construction of 39.00m Long Bridge on Nawabganj Rajshahi RHD (Truck Terminal Bahagola) to Gonka PABASAS Office (UZR-2005) via Kalupur (Hiratoli) Road at ch. 450m Over Bahagola Bill (Road ID-170664014) Upazila: Sadar, District: Chapainawabganj. (Package No.: CIB2-Naw-W-74)
APP ID : 204940
|
Executive Engineer, LGED, Chapainawabganj |
|
25/03/2025
03:30 PM
|
Chapai Nawabganj |
422 |
12.06.0000.241.40.502.25- 530
|
General Manager (Fertilizer Management). |
11/03/2025 |
24/03/2025
12:00 PM
|
Dhaka |
423 |
Construction of Single Storey Principal’s Quarter With Two Storied Foundation at Sylhet Mohila Polytechnic Institute, South Surma, Sylhet.
37.07.0000.018.14.003.24.2
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
17/02/2025 |
18/03/2025
12:00 PM
|
Sylhet |
424 |
Construction of 03 Storied Staff Quarter With 03 Storied Foundation at Sylhet Mohila Polytechnic Institute, South Surma, Sylhet.
37.07.0000.018.14.003.24.2
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
17/02/2025 |
25/03/2025
12:00 PM
|
Sylhet |
425 |
Construction of 04 Storied Female Hostel Building With 04 Storied Foundation at Sylhet Mohila Polytechnic Institute, South Surma, Sylhet.
37.07.0000.018.14.003.24.2
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
17/02/2025 |
10/04/2025
12:00 PM
|
Sylhet |
426 |
18.16.0000.373.01.042(12).24-25/ COMC-01032025
|
Bangladesh Petroleum Corporation (BPC) |
11/03/2025 |
24/03/2025
11:30 AM
|
Dhaka |
427 |
222/DPP/D-4/R of 2024-25
|
Dhaka PWD Division-4, Dhaka |
|
25/03/2025
03:15 PM
|
Dhaka |
428 |
Construction of RCC Container Yard in place of previous TCB Godown beside XY Shed at NRA.
18.13.0000.325.07.035.25
|
xen_building@cpa.gov.bd |
27/02/2025 |
09/04/2025
03:00 PM
|
Chattogram |
429 |
Construction of Four Lane Road in front of Bandar Girl's School & College form NRA old road no. 13 to Port connecting Road at Port North Residential Area.
18.13.0000.325.07.034.25
|
xen_building@cpa.gov.bd |
27/02/2025 |
09/04/2025
03:00 PM
|
Chattogram |
430 |
Construction of 4-storied Academic Building with 4-storied Foundation(Ground floor open) in/c. Sanitary, Water Supply & Internal Electrification works at Hazrat Shahjalal(R:) High School, Dakshin Surma, Sylhet.
37.07.0000.017.19.430.15.923
|
Office of the Executive Engineer, Education Engineering Department, Sylhet. |
10/02/2025 |
25/03/2025
12:00 PM
|
Sylhet |