2611 |
Construction of Model Mosque and Islamic cultural center under the project of 560 nos Model mosque construction in Bangladesh one at Mongla Upazilla,Bagerhat (Type-C)(4 storied building with 4 storied foundation) and another is Chitalmari Upzilla ,Bagerhat (Excluding pile casting work) (Type-B)(3 storied building with 3 storied foundation)
pwd/bgrht/MM/Mongla-Chitalmari/ACE559-524//2023-24
|
Executive Engineer ,Bagerhat PWD |
03/09/2023 |
01/10/2023
01:30 PM
|
Bagerhat |
2612 |
Different B & R Work of Bangladesh Army for the financial year 2023-2 (As per Ser No 15)
01 of 2023-2024/E-06 Dated
|
DW & CE (Army) Dhaka Cantt. |
01/08/2023 |
11/09/2023
12:00 PM
|
Dhaka |
2613 |
Installation of 30" OD High Pressure Natural Gas Transmission Pipeline by Horizontal Direction Drilling (HDD) Method across the Kata river on Design, Installation, Testing, Hook Up & Commissioning.
28.14.0000.231.01.004.23/1416
|
Mechanical Maintenance Department |
31/08/2023 |
04/10/2023
11:00 AM
|
Dhaka |
2614 |
RDPP/MymenJail/PW-1-1
RDPP/MymenJail/PW-1-1 (Tender ID: 864825)
|
Mymensingh PWD Division, Mymensingh |
|
28/09/2023
12:00 PM
|
Mymensingh |
2615 |
Re-construction of Mymensingh Central Jail Project (1st Revised). (Sub-Head: Site development works besides south east portion of Mymensingh Jamalpur Highway).
RDPP/MymenJail/PW-17-2 (Tender ID: 865967)
|
Mymensingh PWD Division, Mymensingh |
|
21/09/2023
12:00 PM
|
Mymensingh |
2616 |
Part-i: Improvement of Kajulia UP-Polshair Bazar Road at Ch. 00-2625m [Road ID No: 335513011] (Salvage Materials Tk. 7,06,498.91) under Kotwalipara Upazila & Part-ii: Improvement of Dumuria UP office-Tungipara HQ Road at Ch. 00-3100m under Tungipara Upazila, District: Gopalganj [Road ID No: 335913005] (Salvage Materials Tk. 18,61,673.74) Total Cost of Salvage Materials Tk. 25,68,173.00).
46.02.0000.931.19.451.23-1185
|
Executive Engineer |
23/07/2023 |
27/09/2023
03:00 PM
|
Gopalganj |
2617 |
CONSTRUCTION OF 05- STORIED ACADEMIC CUM WORKSHOP WITH 04- STORIED ADMINISTRATIVE BUILDING ALONG WITH SERVICE AREA (SINGLE STORY) IN/C SANITARY, ELECTRIFICATION & SITE DEVELOPMENT AND INSTALLATION OF DEEP TUBE-WELL AT ASSASHUNI GOVT. TECHNICAL SCHOOL & COLLEGE ASSASHUNI, SATKHIRA. (PILE FOUNDATION)
EED/Desk-1/2373(1)
|
Office of the Executive Engineer, EED, Satkhira District. |
14/08/2023 |
02/10/2023
11:00 AM
|
Satkhira |
2618 |
CONSTRUCTION OF RETAINING CUM BOUNDARY WALL & GATE AT ASSASHUNI GOVT. TECHNICAL SCHOOL & COLLEGE ASSASHUNI, SATKHIRA.
EED/Desk-1/2373(1)
|
Office of the Executive Engineer, EED, Satkhira District. |
14/08/2023 |
02/10/2023
11:00 AM
|
Satkhira |
2619 |
1. SupRB/Bog/Replace/22-23/W-440
Construction of 25.00m long PSC Girder Bridge on Sariakandi GC-Baluahat GC Road at Chainage: 4800m under Replacement category [Road ID # 110812008] under Sariakandi Upazila, District: Bogura & 2. Construction of 66.06m long RCC Girder Bridge on Bisic Bazar-Rajapur U.P Road at Chainage: 600m under Replacement category [Road ID # 110203022] under Bogura Sadar Upazila, District: Bogura.
APP ID # 194647
|
Md. Golam Morshed, Executive Engineer, LGED, Nishindra, Bogura. |
|
02/10/2023
01:00 PM
|
Bogura |
2620 |
12.06.0000.241.40.190.23.1618
|
General Manager (Fertilizer Management). |
29/08/2023 |
05/09/2023
12:00 PM
|
Dhaka |