21 |
18.16.0000.373.02.263.25-26 COMC 004
|
BANGLADESH AGRICULTURE DEVELOPMENT CORPORATION (BADC) |
13/08/2025 |
18/08/2025
12:15 PM
|
Dhaka |
22 |
18.16.0000.373.02.262.25-26 COMC 003
|
BANGLADESH AGRICULTURE DEVELOPMENT CORPORATION (BADC) |
13/08/2025 |
25/08/2025
12:00 PM
|
Dhaka |
23 |
Construction of 12 Storied Office Building with 3 Basement at Sher-E-Bangla Nagar Administrative Area including Internal Sanitary & Water Supply and Internal Electrification Work.
ACE, Dhaka Metro Zone Memo No-2589; Dt-27/07/2025
|
Executive Engineer, Sher-e-Bangla Nagar PWD Division-2 |
27/07/2025 |
04/09/2025
03:30 PM
|
Dhaka |
24 |
12.06.0000.241.40.513.25- 1787
|
General Manager (Fertilizer Management). |
12/08/2025 |
28/08/2025
12:00 PM
|
Dhaka |
25 |
12.06.0000.241.40.300.25-1786
|
General Manager (Fertilizer Management). |
12/08/2025 |
03/09/2025
12:00 PM
|
Dhaka |
26 |
12.06.0000.241.40.301.25-1790
|
General Manager (Fertilizer Management). |
12/08/2025 |
03/09/2025
12:00 PM
|
Dhaka |
27 |
Construction of 6" dia x 1.5 km x 350 psig high pressure gas Pipeline at Rajshahi BSCIC Industrial Area-2
28.18.0000.000.047.35.001.25-Rajshahi BSCIC 1.5km
|
General Manager (Planning & Development), PGCL |
13/08/2025 |
04/09/2025
12:00 PM
|
Sirajganj |
28 |
Construction of the Department of Military Lands and Cantonments and MEO Central Circle, Dhaka office complex.
23.22.0000.027.14.005.24.216
|
Project Director, "Construction of the Department of Military Lands and Cantonments and MFO Central Circle, Dhaka office complex." Project |
11/08/2025 |
28/08/2025
12:00 PM
|
Dhaka |
29 |
Flight Inspection (Routine/commissioning) and Calibration of Radio Navigational, Visual and RNAV (GNSS) facilities / RNP Approach Procedure /Procedure Design Validation at different Airports of Bangladesh.
30.31.0000.121.07.0028.21.100 Date-28/7/2025
|
Office of the Executive Director (CEMSU) |
28/07/2025 |
10/09/2025
12:00 PM
|
Dhaka |
30 |
Part-A: Estimate For the Laying of 1-400 mm dia uPVC Buried Pipe Main Line Exiting pipe end point to khander pond (Ch. 1+650 Km to Ch. 3+050 Km, Length=1400m) with Ancillary Works. Part-B: Estimate For the Laying of 1-280 mm dia uPVC Buried Pipe, Main Line Ch.2+300 Km Gusiya to Gholar Patal (North Side, Ch. 0+00km to ch. 0 +460km, Length=460m); Main line ch. Ch. 2+300 Km, Gusiya to Sona tala (South side, Ch. 0-+000km to Ch. 0+320km, Length-320m); Main Line Ch. 2+550km, Tipapara to Khashkander (North side Ch. 0+000km to Ch. 0+920km, Length= 920m); Main line Ch.2+55Okm, Tipapara to Boropukuria (South side Ch. 0+000km to Ch. 0+460km Length=460m) (Total Length= 2160m) with Ancillary Works. Part-C: Estimate For the Laying of 1-250mm dia uPVC Buried Pipe Bathandanga Deep To Gorosthan low land ( Ch. 0+650 Km to Ch. 1+250 Km, Length=600m) with Ancillary Works Furniture Supply And Window Fitting of WMCA office. Under Mohadanga Panna Beel Sub-Project (SP No: 44087) Under Sadar Upazila, Dist: Chapainawabganj.
APP ID-214790
|
Executive Engineer, LGED, Chapainawabganj |
03/07/2025 |
26/08/2025
11:00 PM
|
Chapai Nawabganj |