1921 |
Design, Supply, Installation, Testing, Commissioning of Kaptai 1 MWp Solar Power Plant, Extension of Existing 7.4 MWp SPV Plant on Turnkey Basis.
27.11.0000.304.24.317.24
|
Director, Directorate of Purchase, BPDB, Dhaka |
01/01/2024 |
28/02/2024
11:00 AM
|
Dhaka |
1922 |
Reconstruction of damaged portion of the Container Yard at ICD Kamalapur, Dhaka.
18.13.0000.325.07.082.23
|
xen_building@cpa.gov.bd |
03/01/2024 |
01/02/2024
03:00 PM
|
Chattogram |
1923 |
Construction of boundary wall & RCC drain from Bungalow No- 24 to Moheshkhal beside building No.03 at SRA.
18.13.0000.325.07.081.23
|
xen_building@cpa.gov.bd |
08/01/2024 |
30/01/2024
03:00 PM
|
Chattogram |
1924 |
Reconstruction and Renovation of Urban Dispensaries at Mirpur old colony (S.H: Construction of 4-storied Foundation 2 storied Building Government Outdoor Dispensary Lalkuthi Bazar, Mirpur-1, Dhaka) During the Financial year: 2023-24.
HPNSP/PWD/JICA/UD/mirpur-1/2023-24/SE-814
|
Executive Engineer, Mirpur Public Works Division |
28/12/2023 |
29/01/2024
12:00 PM
|
Dhaka |
1925 |
Reconstruction and Renovation of Urban Dispensaries at Mirpur -10,
Dhaka (S.H: Construction of 4-storied Foundation 2 storied Building
Government Outdoor Dispensary. Mirpur-10, Dhaka) During the
Financial year: 2023-24.
HPNSP/PWD/JICA/UD/mirpur10/2023-24/SE-815
|
Executive Engineer, Mirpur Public Works Division |
28/12/2023 |
29/01/2024
12:00 PM
|
Dhaka |
1926 |
Vertical Extension of DTE Building (Sub-Head: Re-Installation of Lifts with floor extension, AC, Networking Systems, Digital Sign Board & Other related works)
pwemw/DTE/2023-24/331/2
|
PWD EM Workshop Division |
02/01/2024 |
15/01/2024
01:00 PM
|
Dhaka |
1927 |
Construction of 5(five) Storied Admin cum Academic Building with 7 storied Foundation including Civil, Sanitary, RCC Road, External Water Supply, Underground Water Reservoir, Rain Water harvesting, Internal Electrification ,200 KVA sub-station, Air Conditioning System, Pump Motor set, Sound System, Solar System, Fire Extinguisher , Compound Security Light and other Ancillary work under the project of "Establishment of Aklima Khatun Textile Vocational Institute at Paikgasa, Khulna.
pwd/khul2/Aklima khatun/Admin cumAcademic/2023-24
|
Executive Engineer PWD Division-02 Khulna |
31/12/2023 |
06/02/2024
12:00 PM
|
Khulna |
1928 |
Improvement work of Dhirganj GC-Dormogar R&H Road via Amgaon, Gadura (Haripur Portion)t Road At 0+00-14+868 Km. (Road ID- 194512004) Upazilla: Haripur , District: THAKURGAON.(Salvage Cost:2019917.00)
APP ID : 196263
|
Executive Engineer ,LGED, Thakurgaon |
31/12/2023 |
01/02/2024
01:00 PM
|
Thakurgaon |
1929 |
Improvement of Lahiri GC-Harinmari GC via Pariahat Road at Ch. 0+000-9+500km [Effective Length=9.50 Km] [Road ID-194082003] under Baliadangi Upazila, District Thakurgaon [Total cost of salvage Material Taka- 24,76,989.00]
APP ID : 196263
|
Executive Engineer ,LGED, Thakurgaon |
01/01/2024 |
01/02/2024
01:00 PM
|
Thakurgaon |
1930 |
Construction of a dual gauge line parallel to the existing meter gauge Line in Dhaka-Narayanganj section project (1st revised ) , Bangladesh Railway, Dhaka
54.01.0000.671.01. 030.23-2155
|
Project Director, Construction of a dual gauge line parallel to the existing meter gauge Line in Dhaka-Narayanganj section project (1st revised ) , Bangladesh Railway, Dhaka |
24/12/2023 |
24/01/2024
12:00 PM
|
Dhaka |