Procurement of 2 nos. Pontoon Barge.
15-Jun-2008 Chittagong [Closing: 22-Jul-2008]
|
|
30,000 MT+/-10% Rock Phosphate (65.5%BPL Min.)
01-Jun-2008 Dhaka [Closing: 22-Jul-2008]
|
|
Electrical Line Operation & Maintenance Materials
26-Jun-2008 Gopalganj [Closing: 22-Jul-2008]
|
|
Supply of 110000 Barrels (plus/minus 5%) on FOB Chittagong Basis.
01-Jul-2008 Chittagong [Closing: 22-Jul-2008]
|
|
Edible Refined Soya bean Oil
06-Jul-2008 Dhaka [Closing: 22-Jul-2008]
|
|
Hard White Shavings, 500 M/Tons.
16-Jul-2008 Rangamati [Closing: 22-Jul-2008]
|
|
Procurement of 25000 MT MOP (±5% at Seller''s option) in two lots.
15-Jul-2008 Dhaka [Closing: 23-Jul-2008]
|
|
35000 M.Ton(App.) Urea Fertilizer Transfer from ZFCL to UFFL Buffer Goddown, Ghorashal, Narsingdi
08-Jul-2008 Brahmanbaria [Closing: 23-Jul-2008]
|
|
Scientific Equipments, Chemicals.
29-Jun-2008 Dhaka [Closing: 23-Jul-2008]
|
|
Up-gradation/Replacement of existing obsolete model of Burner Management Systems Mini Line 520 (Pneumatic) & Net-90. Safe dismanthling of obsolete existing system prior to installation and put the boilers into normal operation after commissioning with proposed DCS on Turn-key basis as detailed in the tender document.
15-Jun-2008 Chittagong [Closing: 23-Jul-2008]
|
|
The Rehabilitation works includes supply of Rails Turnouts, Fish plates, Fish bolts, Steel Sleepers, Wooden, sleepers, other track materials. Welding materials, Complete track renewal, Welding of rails, Supply and placing of ballast, Re-profilling of cess & bank, Construction of new Bridges, Re-construciton/Repair station buildings, station platform, platform sheds construction of ballast wall. up grading of level crossing gates, construction of boundary wall etc. on turnkey basis.
15-Jun-2008 Chittagong [Closing: 23-Jul-2008]
|
|
Procurement of 4 nos. Four Wheel Drive Vehicle
23-Jun-2008 Faridpur [Closing: 23-Jul-2008]
|
|
Cathodic Protection Materials
01-Jun-2008 Comilla [Closing: 24-Jul-2008]
|
|