FAQ's Downloads Contact & Feedback Email Subscription Forum Site Map

IMED, MINISTRY OF PLANNING, GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH
 
 Home      Advertisement Search      News      Ministry/Agency Login
Main Menu







Developed by

  
 

Printable View  

   
 
     
  Search Text:                  Search Tips  
                       
 

Advanced Search

 
293 Advertisement Notice(s) found.
 
 GOODS
  TitleProcuring EntityIssue DateClosingPlace
Procurement of 11 (Eleven) Categories Registers, Forms & Cards. Director (MCH-Service) & Line Director (MC-RAH) 29-Mar-2015 31-Mar-2015
11:30 AM
Dhaka
Construction of 20" DN x 300 PSIG x 10 Km natural Gas Pipeline from Aronghata GTCL CGS to Khulna Power Station CMS, Khalishpur, Khulna. Sundarban Gas Company Ltd. (SGCL) 29-Mar-2015 28-Apr-2015
12:00 PM
Dhaka
Expansion and quality Improvement of Nursing Education Project at S.B.Nagar, Dhaka.(Sub-Head:-Sinking & Installation of 150mmX300mm Dia G.I Pipe deep tube well including 38mm dia test & observation well with supplying and installation of 41 HP submersible pump motor set, water supply pipe line & Construction of 30,000 Gallon Capacity Underground water reservoir & Pump House). Executive Engineer, S.B. Nagar PWD Division-1, Dhaka. 29-Mar-2015 16-Apr-2015
12:00 PM
Dhaka
Procurement of 50,000 MT (+5%) Wheat Director General of Food 27-Mar-2015 08-Apr-2015
01:00 PM
Dhaka
Machinery and Equipment Project Director, Basic Literacy Project (64 Districts) 25-Mar-2015 07-Apr-2015
2:00 PM
Dhaka
Procurement of Supply, Installation, Testing & Commissioning of Fire Fighting System of Storage tank & day tank of Fuel Oil (HSD) of Bheramara Power Station, BPDB, Kushtia . Bangladesh Power Development Board (BPDB) 25-Mar-2015 13-May-2015
11:00 AM
Barisal
Procurement of Supply, Installation, Testing & Commissioning of Fire Fighting System of Storage tank & day tank of Fuel Oil (HSD) of Bheramara Power Station, BPDB, Kushtia . Bangladesh Power Development Board (BPDB) 25-Mar-2015 13-May-2015
11:00 AM
Barisal
Re-Invitation for Bids(IFB/IFT) for procurement of MSR Good for Civil Surgeon office, Chittagong in the fiscal year 2014-2015 Civil Surgeon, Civil surgeon office,chittagong 25-Mar-2015 05-Apr-2015
12:00 PM
Chittagong
Procurement of four (4) numbers of Reach Stacker with spare parts, tools, accessories and related services for handling loaded 20’ and 40’ ISO containers. Chittagong Port Authority 25-Mar-2015 25-May-2015
12:00 PM
Chittagong
Procurement of Motor Cycle Secondary Education Sector Investment Program (SESIP) 25-Mar-2015 16-Apr-2015
12:00 PM
Dhaka
Supply and Installation of Training Equipment Department of Surgery, BSMMU 25-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Medicines (Package-A&B), Medical and Surgical Instrument (Package-C) & Dental Instrument (Package-C). Inspector General of Prisons, Prisons Directorate, Dhaka 25-Mar-2015 06-Apr-2015
12:00 PM
Dhaka
Construction of Civil Surgeon Office at Pabna. Chief Engineer, Health Engineering Department, Ministry of Health and Family Welfare. 25-Mar-2015 09-Apr-2015
12:30 PM
Dhaka
Installation of 38 mm dia 14 Nos Test Tube Wells, 350 x 150 mm dia 7 Nos Production Wells & construction of 7 Nos Pump houses and Repleacement of 7 km different dia pipeline at Feni Pourashava under 37 District Water Supply Project during the year 2014-2015. Executive Engineer, DPHE, Feni District, Feni 25-Mar-2015 22-Apr-2015
1:00 PM
Feni
Medical Equipment under Lot No.-A (Automatic PCR Machine, Complete); Lot No.-B (Auto-Extractor for PCR) &Lot No.-C (HLA Typing System) Ahsania Mission Cancer and General Hospital (AMCGH) 25-Mar-2015 11-Apr-2015
11:00 AM
Dhaka
Supply of 14 Jeeps for the usage of Government works of Public Works Department (PWD) (2nd Phase). Executive Engineer, PWD E/M Division-5, Dhaka. 24-Mar-2015 27-Apr-2015
12:00 PM
Dhaka
Supply and installation of Computer and Computer Accessories for computer lab. Supply and installation of Laptop for multimedia classroom. Supply and installation of Multimedia Projector for multimedia classroom. Supply and installation of Sound System: Amplifier, Speaker, Microphone with necessary cables for multimedia classroom. Supply and installation of wirless modem for computer lab and multimedia classroom. Supply and installation of Furniture for computer lab and multimedia classroom. Development of Post Graduate Govt. Colleges in District Head Quarters for Improving Quality of Education Project. 24-Mar-2015 21-Apr-2015
01:00 PM
Dhaka
Procurement of 50,000 MT (+5%) Wheat Director General of Food 24-Mar-2015 08-Apr-2015
01:00 PM
Dhaka
Supply of Burn Tank Professors, NIBPS, HDPD, Dhaka Medical College Hospital, Dhaka 24-Mar-2015 16-Apr-2015
12:00 PM
Dhaka
Supply of Ammonia Condense (Item No. 58-2104) Ashuganj Fertilizer Chemical Company Ltd., Ashuganj, Brahmanbaria. 23-Mar-2015 06-May-2015
10:30 PM
Brahmanbaria
Procurement of 1st Stage Nozzle Assy. Complete Set with Hardware for GT Unit 1, 2 & 3 of Bheramara Power Station, BPDB, Kushtia . Bangladesh Power Development Board (BPDB) 23-Mar-2015 07-May-2015
11:00 AM
Dhaka
Procurement of Uniform Items Director (Admin-Q), Ansar & VDP HQs, Khilgaon, Dhaka. 22-Mar-2015 06-Apr-2015
11:30 AM
Dhaka
PROCUREMENT OF 3", 4" & 6" DIA POL PRODUCT HANDLING, SUCTION & DISCHARGE HOSE MEGHNA PETROLEUM LIMITED(A Subsidiary of Bangladesh Petroleum Corporation) 22-Mar-2015 02-Apr-2015
03:00 PM
Chittagong
Procurement of Artificial Insemination Equipment & Others Deputy Director, Artificial Insemination & Fodder Cultivation,Department of Livestock Services, Krishi Khamar Sarak, Farmgate, Dhaka-1215 22-Mar-2015 05-Apr-2015
1:00 PM
Dhaka
Awareness materials for ISF of SEQAEP. Project Director, Secondary Education Quality and Access Enhancement Project (SEQAEP). 22-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Lot 1 : Supply of 06 Nos. 4WD Double Cabin Pickup; Lot 2 : Supply of 03 Nos. 4WD Service Vehicles Project Director, MDSP, LGED. 22-Mar-2015 21-Apr-2015
12:00 PM
Dhaka
Fire Fighting Appliances Director General, Fire Service & Civil Defence Directorate, Dhaka. 19-Mar-2015 06-Apr-2015
12:00 PM
Dhaka
Procurement of 1 No. 4-wheel drive Double cabin Pickup and 1 No. Sedan Car Under NCB Khulna Water Supply & Sewerage Authority 19-Mar-2015 13-Apr-2015
03:00 PM
Khulna
Supply of 24 (Twenty Four) Two Wheeler Water Mist, 10 (Ten) Four Wheeler Water Mist and 5 (Five) 600 Hundred Litres (Min.) Pump Driven Water Mist System Mounted with Related Services Project Director, Procurement of Equipment for Search and Rescue Operation for Earthquake and other Disaster Project (Phase- II) 19-Mar-2015 21-Apr-2015
12:00 PM
Dhaka
Supply of 10 (Ten) Rescue Vehicle Pick-up with Related Services Procurement of Equipment for Search and Rescue Operation for Earthquake and other Disaster Project (Phase- II) 19-Mar-2015 05-May-2015
12:00 PM
Dhaka
N/A Assistant Inspector General (Logistics), Bangladesh Police 19-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Supply of 2 (Two) Hydraulic Breakers, 2 (Two) Crusher and Cutter and 2 (Two) Power Fork with Related Services Procurement of Equipment for Search and Rescue Operation for Earthquake and other Disaster Project (Phase- II) 19-Mar-2015 05-May-2015
12:00 PM
Dhaka
Carrying of 125000 MT Urea Fertilizer in bag from Chittagong Port General Manager (Marketing), Marketing Division, BCIC, BCIC Bhaban (18th Floor), 30-31, Dilkusha C/A, Dhaka 19-Mar-2015 13-Apr-2015
12:00 Noon
Dhaka
Supply of In Line Breathing Apparatus, Air Ventilator, Hydraulic Spreader Set (25 Ton), Hydraulic Cutter Set (25 Ton), Hydraulic Ram Jack, Air Lifting Bag, Portable Eco Sonar, Side Scan Sonar, Combi Set (Back Pack) with Related Services for each items Procurement of Equipment for Search and Rescue Operation for Earthquake and other Disaster Project (Phase-II) 19-Mar-2015 05-May-2015
12:00 PM
Dhaka
Supply of 6 (Six) Excavator Hydraulic (Tr. Type) with Long Boom (with Hy Cutter, Hy Breaker, Crusher Cutter and Hy Power Fork with Related Services Procurement of Equipment for Search and Rescue Operation for Earthquake and other Disaster Project (Phase- II) 19-Mar-2015 05-May-2015
12:00 PM
Dhaka
Supply of 12.00 lac Pcs. Woven Polypropylene (WPP) Bags without Inner Liner. Bangladesh Chemical Industries Corporation (BCIC). 19-Mar-2015 09-Apr-2015
11:00 AM
Dhaka
Design, Supply, Installation, Testing, and Commissioning of Computer-based Interlocking Color Light Signaling System and Related Works & Services at eleven (11) Stations of Chinki Astana-Chittagong Section in Bangladesh Railway Project Director (Signal), Bangladesh Railway, Railbhaban,Dhaka 19-Mar-2015 11-May-2015
02:00 PM
Dhaka
Supply, Installation, Testing and Commissioning of Split Type Air Conditioning Units, Diesel Engine Generator Sets, Earthing etc for BTCL''s different District and Upazilla Exchanges Under UOFCNDP Project on Full Turn- Key Basis. Managing Director, BTCL 19-Mar-2015 31-Mar-2015
11:45 AM
Dhaka
Procurement Regarding Printing Materials Secondary Education Sector Investment Program (SESIP) 19-Mar-2015 02-Apr-2015
12:00 PM
Dhaka
Dredging in Nil Komol Khal at Hiron Point. Mongla Port Authority 18-Mar-2015 06-Apr-2015
02:00 PM
Bagerhat
Supply of 2 (Two) Snorkels with Related Services Project Director, (Phase- II) 18-Mar-2015 21-Apr-2015
12:00 PM
Dhaka
2500 MT Urea formaldehyde (UFC-85) Jamuna Fertilizer Compary Ltd., Tarakandi, Jamalpur. 18-Mar-2015 08-Apr-2015
11:00 AM
Jamalpur
Procurement of Potassium Carbonate 122.00 MT. Bangladesh Chemical Industries Corporation (BCIC) 18-Mar-2015 28-Apr-2015
11:00 AM
Dhaka
Supply of 1(One) Chemical Tender and 1(One) Multipurpose Vehicle with Related Services Project Director (Phase- II) 18-Mar-2015 21-Apr-2015
12:00 PM
Dhaka
Support to skills development coordination and monitoring unit (SDCMU), Skills for Employment investment program. Support to skills development coordination and monitoring unit (SDCMU), Skills for Employment investment program. 16-Mar-2015 16-Apr-2015
02:30 PM
Dhaka
Construction of Battalion Head Quarter Complex of Ansar & VDP (15 Ansar Battalions in 1st phase) at Gopalgonj. Executive Engineer, PWD Division, Gopalgonj. 16-Mar-2015 13-Apr-2015
12:00 PM
Gopalganj
Procurement of Procurement of Lot # 1 : Packaging of DDS Kits & Lot # 2: Packaging of Delivery Kits. Director(Logistics & Supply) and Line Director (PS&SM), DGFP 16-Mar-2015 30-Mar-2015
11:00 AM
Dhaka
Manufacturing & Supplying of Furnitrue for academic Building (for 3 class room) for the financial year 2014-2015 Executive Engineer, EED, Sylhet Zone, Sylhet 16-Mar-2015 08-Apr-2015
1:00 PM
Sylhet
Procurement of Air Condition System Attachment to Helicopter Model-Bel-407 DG, RAB 16-Mar-2015 05-Apr-2015
12:00 PM
Dhaka
PROCUREMENT OF 3", 4" & 6" DIA POL PRODUCT HANDLING, SUCTION & DISCHARGE HOSE MEGHNA PETROLEUM LIMITED(A Subsidiary of Bangladesh Petroleum Corporation) 15-Mar-2015 02-Apr-2015
12:00 PM
Chittagong
Supply of 2 Nos. 10,000Ltr capacity ARFF (Aircraft Resque & Fire Fighting) Vehicle for HSIA, CAAB. Director, CEMSU, CAAB, Kurmitola, Dhaka. 15-Mar-2015 20-Apr-2015
12:00 Noon
Dhaka
Supply of submersible pump set (without column pipe). Superintending Engineer, BMDA, Thakurgaon Circle 15-Mar-2015 08-Apr-2015
12:30 PM
Thakurgaon
Supply, Installation, Testing and Commissioning of Split Type Air Conditioning Units, Diesel Engine Generator Sets, Earthing etc for BTCL''s different District and Upazilla Exchanges Under UOFCNDP Project on Full Turn- Key Basis. Managing Director, BTCL 15-Mar-2015 31-Mar-2015
11:45 PM
Dhaka
Procurement of Bomb Disposal & Explosive Equipment. Director General, Rapid Action Batalion (RAB), Forces. 15-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
1. GD-1 Procurement of Computer, laptop, UPS, Printer, Server, Software, Scanner, Internet Networking for BKMEA, BGMEA, BTMA, BACI, BEIOA, PKSF, BBSME; Support to Skills Development Coordination and monitoring Unit (SDCMU), Skills for Employment Investment Program 15-Mar-2015 16-Apr-2015
02:30 PM
Dhaka
Procurement of 400mm uPVC Pipe with accessories & related works. Superintending Engineer, BMDA, Rajshahi. 15-Mar-2015 09-Apr-2015
12:00 PM
Rajshahi
Procurement of Double Cabin Pickup for District Social Service Offices Director, (Admin & Finance), Department of Social Welfare 15-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
Procurement of Intelligence Equipment For RAB, HQ. DG, RAB 15-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Auto Disable (AD) Syringe 3ml & 5ml. Director PHC & Line Director, MNC&AH, DGHS 15-Mar-2015 09-Apr-2015
11:30 AM
Dhaka
Appointment of Carrying Contractor. Bangladesh Chemical Industries Corporation (BCIC) 15-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Fire Fighting Appliances Director General, Fire Service & Civil Defence 15-Mar-2015 06-Apr-2015
12:00 PM
Dhaka
Supply, Installation and Commissioning of new Plants & Machinery Chief Mechanical Engineer (East) & Project Director, 12-Mar-2015 30-Apr-2015
12:00 PM
Chittagong
Procurement of Security Spare Parts for GT Unit 1, 2 & 3 of Bheramara Power Station, BPDB, Kushtia . Bangladesh Power Development Board (BPDB) 12-Mar-2015 27-Apr-2015
11:00 AM
Barisal
Supply of Decomposed Cowdung /Compost for Plantation Raising Divisional Forest Officer, Chittagong North Forest Division. 11-Mar-2015 31-Mar-2015
02:30 PM
Chittagong
Land Development/Earth Filling. (2nd phase) at BSCIC industries Estate Extension, Gopalgongj. BSFIC, Gopalgonj. 11-Mar-2015 01-Apr-2015
11:00 PM
Gopalganj
Manufacturing & supplying of Furniture for Academic Building (For 3 class room) for the financial year 2014-2015. Executive Engineer, Education Engineering Department, Sylhet Zone, Sylhet. 11-Mar-2015 08-Apr-2015
01:00 PM
Sylhet
Runway carpeting work at Barisal Airport ( S. H.:- Improvement of main approach road in/c. other allied works). CIVIL AVIATION AUTHORITY OF BANGLADESH 11-Mar-2015 27-Apr-2015
12:00 PM
Dhaka
Construction of security boundary wall along the main approach road beside the CAAB recovered area from outsiders at Osmani International Airport, Sylhet ( S. H.:- Construction of security boundary wall at south- west side of Runway 11 end in/c. other allied works). Civil Aviation Authority of Bangladesh, HQ,Dhaka. 11-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Construction of 1xSM Bk (6 storey with 6 storied foundation) including ancillary works with CH/DH and recreation room at Qadirabad Cantt. DW & CE (Army) 11-Mar-2015 02-Apr-2015
12:00 PM
Dhaka
Construction of 1xSM Bk (6 storey with 6 storied foundation) including ancillary works with CH/DH and recreation room at Sylhet Cantt (1st Phse). DW & CE (Army) 11-Mar-2015 05-Apr-2015
12:00 PM
Dhaka
Construction of 1x 360 Sainik & 12 NCO''s Sm Bk (04 Storey with 06 storied foundation with CH/DH, Recreation room & store (o2 storey with 03 storied foundation) including internal/external services for Arty Centre & School at Halishar Cantt. Ctg. (1st Phase). DW & CE (Army) 11-Mar-2015 05-Apr-2015
12:00 PM
Dhaka
Construction of 1x SM BK (5-storey with 5-storey foundation complex (SM-II) ancillary works for 17 Inf Division at Sylhet Cantt. (1st Phase). DW & CE (Army) 11-Mar-2015 06-Apr-2015
12:00 PM
Dhaka
Manufacturing &Supplying Furniture for Govt. College and School at Kurigram/Lalmonirhat District. Executive Engineer, Education Engineering Department, Kurigram Zone, Kurigram. 11-Mar-2015 30-Mar-2015
01:00 PM
Kurigram
Furniture,HospitalBed,Foam Mattress, Bed side Locker, Saline Stand. 250 Beded (1st Phase 150) TB Hospital,Shyamoli, Dhaka. 11-Mar-2015 30-Mar-2015
12:30 PM
Dhaka
Procurement of Procurement of Lot # 1 : Packaging of DDS Kits & Lot # 2: Packaging of Delivery Kits. Director(Logistics & Supply) and Line Director (PS&SM), DGFP 11-Mar-2015 30-Mar-2015
11:00 AM
Dhaka
Identification of Packages are specified Identification System for Enhancing Access to Services (IDEA) Project 11-Mar-2015 13-Apr-2015
02:00 PM
Dhaka
Supply of uPVC pipe and moulded fittings. Executive Engineer, DTIP-2, BMDA, Rajshahi. 10-Mar-2015 07-Apr-2015
12:00 PM
Rajshahi
Procurement of Twist-Tight (TT) Type Bar Coded Seal & Four Level Security Seal Director,Purchase,BPDB,Dhaka. 09-Mar-2015 29-Apr-2015
11:00 AM
Barisal
Tender Document For Supply, Installation, Configurations of Application Servers & Database servers including migration along with required database license software for Core Banking Solution (T24) of Agrani Bank Limited. Deputy General Manager, Information Technology & MIS Division, Agrani Bank Limited. Head Office, 9/D, Dilkusa C/A, Motijheel, Dhaka - 1000. 09-Mar-2015 06-Apr-2015
04:00 PM
Dhaka
Gas Mask Inspector General, Bangladesh Police 09-Mar-2015 09-Apr-2015
02:00 PM
Dhaka
Medical Equipment Project Director, Extension of National Institute of Traumatology & Orthopedic Rehabilitation (NITOR), Room-308, Shere Bangla Nagar , DHAKA-1207 09-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Medical Equipment Project Director, Extension of National Institute of Traumatology & Orthopedic Rehabilitation (NITOR), Room-308, Shere Bangla Nagar , DHAKA-1207 09-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Medical Equipment Extension of National Institute of Traumatology & Orthopedic Rehabilitation (NITOR), Room-308, Shere Bangla Nagar, DHAKA-1207 09-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Medical Equipment Extension of National Institute of Traumatology & Orthopedic Rehabilitation (NITOR), Room-308, Shere Bangla Nagar, DHAKA-1207 09-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Procurement of Electronic Total Station (ETS) with its related accessories and training for DLR&S. Project Director & Director (Surveys) 09-Mar-2015 30-Mar-2015
02:00 PM
Dhaka
Procurement of 33 kV Outdoor Type Circuit Breaker, 33 kV Control, Relay & Metering Panel for Outgoing/Incoming Feeder and 33 kV Control, Relay & Metering Panel for 33/11 kV Transformer Feeder. Superintending Engineer, Contract & Procurement CircleDhaka Power Distribution Company Limited (DPDC). 09-Mar-2015 06-Apr-2015
12:00 PM
Dhaka
2500 M.Tons. UREA FORMALDEHYDE (UFC-85) Jamuna Fertilizer Company Ltd. 08-Mar-2015 08-Apr-2015
11:00 AM
Jamalpur
Procurement of Equipment for Bangladesh Textiles Mills Association (BTMA) Additional Secretary and National Project Director, SEIP Project, Finance Division, Ministry of Finance 08-Mar-2015 02-Apr-2015
02:00 PM
Dhaka
Purchase of Equipment & Reagent for Pathology Lab. Project Director, Livestock Disease Prevention and Control Project. 08-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Supply of 5000 Nos etc Chief Engineer/West, Bangladesh Railway, Rajshahi. 08-Mar-2015 21-Apr-2015
12:00 PM
Rajshahi
Procurement of 10,000 MT+/-5% Phosphoric Acid (P205 : 52-54%). Bangladesh Chemical Industries Corporation (BCIC) 08-Mar-2015 02-Apr-2015
11:00 AM
Dhaka
Lot-1: Aerial Triangulation SoftwareLot-2: Computer for Aerial TriangulationLot-3: GIS Software Project Director & Surveyor General of Bangladesh. 05-Mar-2015 15-Apr-2015
02:00 PM
Dhaka
Lot G6A: BOD Analyzer Test System, COD System, Atomic Absorption Spectrophotometer, UV/ VIS- Spectrophotometer, Microscope Trinocular Head, Other Lab equipments accessories.Lot G6-B: Lab Furniture and accessories. Project Director, Capacity Building of BEPZA, Dhaka. 05-Mar-2015 01-Apr-2015
12:00 PM
Dhaka
Procurement of 2 (two) numbers Rubber Tyred Gantry Crane (RTG) with spare parts, tools, accessories and related services. Chittagong Port Authority 05-Mar-2015 11-May-2015
12:00 AM
Chittagong
Purchase of Platform (weighing scale) balance Project Director, Beef Cattle Development Project, Dahaka 05-Mar-2015 31-Mar-2015
01:00 PM
Dhaka
Development of GIS for improving monitoring and HRM (countrywide) (Server-1, Tab-320, On Line UPS-1, Battery-320, Software-1, Modem with sim and 1 year connectivity-320,Training-320, Installation and Maintenance) Directorate General of Family Planning, 6 Karwanbazar, Dhaka1215, Bangladesh. 04-Mar-2015 30-Mar-2015
11:00 AM
Dhaka
Construction of Academic bldg (4 storey with 6 storied fdn) with ancillary works for English Version Cantonment Public School & College under National Curriculum at Comilla Cantt. Army Headquarters, E in C’s Branch, Works Directorate, Dhaka Cantonment 04-Mar-2015 02-Apr-2015
12:00 PM
Dhaka
Supply, Installation and Commissioning of machines for nontraditional machine shop under the project of MPPU.. of BCSIR. A. GD10(F), B. GD11(F) & C. GD12(F) Project Director, Modernization of Pilot Plant Unit to commercialize the most viable R&D products of BCSIR. 04-Mar-2015 02-Apr-2015
03:00 PM
Dhaka
Procurement of Bi-Colour Modern Offset Map Printing Press with computer to plate (CtP) & High Precision Flat-bed scanner including installation, operation & skill-level training for DLR&S. Project Director & Director (Surveys) 04-Mar-2015 16-Apr-2015
02:00 PM
Dhaka
Design, Manufacture, Supply, Installation, Testing & Commissioning of Pre-Paid Meters with Related Services on Turn Key Basis. Bangladesh Power Development Board (BPDB). 03-Mar-2015 16-Apr-2015
10:30 AM
Dhaka
Design, Manufacture, Supply, Installation, Testing & Commissioning of Pre-Paid Meters with Related Services on Turn Key Basis. Bangladesh Power Development Board (BPDB). 03-Mar-2015 16-Apr-2015
10:30 AM
Dhaka
Line Hardeare, Insulator, Conductor,ACSR,Bare, Conductor & Guy Accessories Project Director, 1.8 Million Consumer Connection Through Rural Electrification Expansion. 03-Mar-2015 02-Apr-2015
12:00 PM
Dhaka
Supply of Motor Cycle with accessories and Related Services PMU, Coastal Embankment Improvement Project, Phase-1(CEIP-1) 03-Mar-2015 31-Mar-2015
02:00 PM
Dhaka
Installation of Walkie Talkie Project Director, Capacity Building of BEPZA, Bangladesh Export Processing Zones Authority 02-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
C&W Steel Tyre Wheel Flanged size: 2''-4.1/2" IRS Drg No. W/772 alt-(13) & Specification No. Code-810-1-133 (Table-1) Steel 28.1/2" = 625 Nos Chief Controller of Stores 02-Mar-2015 13-Apr-2015
12:00 PM
Chittagong
Supply, Installation, Testing & Commissioning of Automatic (Digital) Weather Station (AWS) with Telemetry at Bangabandhu Bridge Area, Bhuapur, Tangail Bangladesh Bridge Authority 01-Mar-2015 08-Apr-2015
12:00 PM
Dhaka
Procurement of Lab.Equipment for setting up Environmental Laboratory in CEPZ and DEPZ Project Director, Capacity Building of BEPZA, Bangladesh Export Processing Zones Authority 01-Mar-2015 01-Apr-2015
12:00 PM
Dhaka
Procurement of 30,000 MT+/-10% Rock Phosphate (72 % BPL Min.). Bangladesh Chemical Industries Corporation (BCIC) 01-Mar-2015 09-Apr-2015
11:00 AM
Dhaka
Supply, Installation, Testing & Commissioning of Demi Water Treatment Plant (capacity 10 M3/hr x 2 no.) for Unit # 1 of Fenchuganj Combined Cycle Power Station, BPDB, Sylhet Director,Purchase,BPDB,Dhaka. 26-Feb-2015 16-Apr-2015
11:00 AM
Dhaka
Procurement of Electrical Spare Parts (Cable, VFD House, MCC House, Rig Light, Sullair Compressor, DE-1000 Centrifuge) for ZJ50DBS Rig Shahjadpur-Sundalpur # 2 Development / Appraisal Drilling Project Project Director, Shahjadpur-Sundalpur # 2 Development / Appraisal Drilling Project., Bangladesh Petroleum Exploration & Production Company Limited (Bapex) 24-Feb-2015 30-Mar-2015
11:00 AM
Dhaka
Procurement of Mechanical Spare Parts for ZJ50DBS Rig for Shahjadpur-Sundalpur # 2 Development / Appraisal Drilling Project Project Director, Shahjadpur-Sundalpur # 2 Development / Appraisal Drilling Project., Bangladesh Petroleum Exploration & Production Company Limited (Bapex) 24-Feb-2015 01-Apr-2015
11:00 AM
Dhaka
Procurement of 2D Field Planning/Designing/Quality Control Equipment, Software & Hardware. Project Director, 2D Seismic Project of Bapex 24-Feb-2015 30-Mar-2015
11:00 AM
Dhaka
Procurement of different types of Transmitters and Calibration Instruments for GT, GBC & BOP units of Siddhirganj 2×120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh. Chief Engineer, Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd. 23-Feb-2015 06-Apr-2015
12:00 PM
Narayanganj
CNG Mass Flow Meter Calibration/Verification System etc. Direcotr General, BSTI, Dhaka 23-Feb-2015 23-Apr-2015
11:00 AM
Dhaka
Washed Insustrial white marine salt. Etc. Chittagong Chemical Complex 19-Feb-2015 31-Mar-2015
11:00 AM
Chittagong
Supply, Installation, Testing and Commissioning of 100 Nos. 12V, 150AH Sealed Lead Acid Maintenance Free Battery for 3 Nos. Online UPS ( 1 No 60KVA & 2 Nos. 80KVA) od BTV Rangamati, Zhenaidah and Satkhira Relay Station on turn-key basis. Additional Chief Engineer, BTV, Dhaka 19-Feb-2015 21-Apr-2015
03:00 PM
Dhaka
Procuremenrt of "MRI Machine 1.5 Tesla" Director, Stores & Supplies 19-Feb-2015 08-Apr-2015
11:00 AM
Dhaka
Procurement of 11/0.4KV,250KVA Distribution Transformer & Accessories Director,Purchase,BPDB,Dhaka. 18-Feb-2015 01-Apr-2015
11:00 AM
Barisal
Procurement of Hardware for Major Inspection Work of GT Unit 8&9 of Shahjibazar Power Station, BPDB, Hobiganj. Director,Purchase,BPDB,Dhaka. 12-Feb-2015 02-Apr-2015
11:00 AM
Dhaka
Construction & Supply of 4 Nos. Cutter Suction Dredgers (amphibian type). Chairman, BIWTA, represented by the Project Director. 11-Feb-2015 16-Apr-2015
12:30 PM
Dhaka
Procurement of Spare Parts for HGPI of Sylhet 20MW Gas Turbine Power Station, BPDB, Kumargaon, Sylhet. Director,Purchase,BPDB,Dhaka. 10-Feb-2015 31-Mar-2015
11:00 AM
Dhaka
Axle for LHB 64 Type Coaches BG as per Drg. No. 10.03.057 Mat. Spec. R-16 = 101 Nos. Chief Controller of Stores Bangladesh Railway, Pahartali, Chittagong-4202. 05-Feb-2015 20-Apr-2015
12:00 PM
Chittagong
Transmitter & Other Relevant Equipment for Bangladesh Betar, Dhaka & Transcription Service, Bangladesh Betar. Project Director 04-Feb-2015 02-Apr-2015
11:00 AM
Dhaka
Appointment of Pre-Shipment Inspection & Post Landing Inspection Agent. Bangladesh Chemical Industries Corporation (BCIC) 02-Feb-2015 23-Apr-2015
11: 00 AM
Dhaka
Procurement of Exhaust Frame and Exhaust Diffuser with Installation, Testing & Commissioning on Turnkey Basis for F9E (DLN1) Turbine of Tongi 80MW Gas Turbine Power Station, BPDB, Gazipur. Director,Purchase,BPDB,Dhaka. 15-Jan-2015 31-Mar-2015
11:00 AM
Dhaka
Supply of 70 Nos. Meter Gauge (MG) Diesel Electric (DE) Locomotives for Bangladesh Railway. Chief Mechanical Engineer, Project & Project Director, Bangladesh Railway, Dhaka 30-Dec-2014 20-Apr-2015
11:00 AM
Dhaka
Supply of 20.10 lac Pcs. Woven Polypropylene (WPP) Bags with Inner Liner at (KAFCO), Rangadia, Chittagong. Bangladesh Chemical Industries Corporation (BCIC). 09-Oct-2014
Dhaka
Procurement of Chemical & Re-agents, Glassware Principal Scientific Officer, Anthrax Vaccine Production Section, Livestock Research Institute, Mohakhali, Dhaka. 11-Oct-2010 03-Nov-2020
01:00 PM
Dhaka
 WORKS
  TitleProcuring EntityIssue DateClosingPlace
Repair, Renovation, Rehabilitation of Govt. Educational Institutions situated in Rangpur & Gaibandha District. Executive Engineer, Education Engineering Department, Rangpur Zone, Rangpur. 29-Apr-2015 07-Apr-2015
01:00 PM
Rangpur
02/Rev./Fur/Govt. & Non-Govt. Institutions. Executive Engineer, Education Engineering Department, Bogra Zone, Bogra. 24-Apr-2015 06-Apr-2015
12:00 PM
Bogra
Supply, Installation and Testing (where necessary) of Mechanical(Motorized) & Non-Mechanical (Non-Motorized) Rides including foundation with necessary civil works at Tungipara Sk.Rassel Poura Shishu Park, Tungipara Pourashava, District. Gopalgonj. Md. Abul Hassan, Project Director, INPIDP, LGED, Dhaka. 29-Mar-2015 23-Apr-2015
01:00 PM
Dhaka
Construction of Road & Drain Dohar Pourashava. 29-Mar-2015 21-Apr-2015
01:00 PM
Dhaka
Construction of 60 Investigation Center in Type Plan for Police Department in Different places of Bangladesh one at Tarabunia, Kathalia in the Dist. Of Jhalakati. S.H :- Construction of Main Building in/c. Civil, Sanitary, Electrification and other Ancillary works. Executive Engineer, Jhalakati PWD Division, Jhalakati 29-Mar-2015 21-Apr-2015
12:00 PM
Jhalokati
Cox''s Bazar District Court building, on the 3rd floor up to the second floor of the extension work. [Detailes As per TDS] Executive Engineer, Cox''s Bazar PWD Division, Cox''s Bazar. 29-Mar-2015 20-Apr-2015
12:00 PM
Cox's Bazar
Construction of Battalion Head Quarter Complex of Ansar & VDP (15 Ansar Battalions in 1st phase) at Gopalgonj. Executive Engineer, PWD Division, Gopalgonj. 29-Mar-2015 13-Apr-2015
12:00 PM
Gopalganj
Extension of Shaheed Sheikh Abu-Naser Specialized Hospital at Khulna. Executive Engineer, Khulna PWD Division-1, Khulna. 29-Mar-2015 02-Apr-2015
12:00 PM
Khulna
Eastablishment of Fire Service & Civil Defence Station in 156 Important Upazilla/ Places of the Country one at Dhanbari Upazilla (B-Type) in the District of Tangail including Sanitary & Water supply arrangement, Boundary Wall with Gate, Underground Reservoir with pump house, Electrification & other ancillary works,. during the FY 2014-2015. Executive Engineer, Tangail P.W.D.Division, Tangail. 29-Mar-2015 21-Apr-2015
12:00 PM
Tangail
Construction. of 3 Class room Academic Building with 4- storied foundation in/c Sanitary , water supply & Electrification works at seleected Educational Institution. Executive Engineer, Education Engineering Department, Pirojpur Zone, Pirojpur. 29-Mar-2015 20-Apr-2015
1:00 pm
Pirojpur
Vertical Extension of Academic Building-4 In/c. Repair & Renovation Work at Jessore Zilla School. Executive Engineer, Education Engineering Department, Jessore Zone, Jessore. 29-Mar-2015 23-Apr-2015
12:00 PM
Jessore
Construction of 3-Class room academic building with 4-storied foundation in/c. Sanitary, Water supply, & Electrification works at Selected Educational Institution. (Lot No. 01 to 06.) Executive Engineer, Education Engineering Department, Noakhali Zone. 27-Mar-2015 30-Mar-2015
01:00 PM
Noakhali
Provn of electric supply line through express feeder from PDB Patenga Sub-station to Sub-Station No. 01 & 02 at BAF Base ZHR Ctg DW & CE (Air) Kurmitola, Dhaka Cantt. 27-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
Procurement of Sea Going Vessels & Infrastructure Development of Bangladesh Coast Guard Executive Engineer, P.W.D Division No-3, Chittagong 25-Mar-2015 23-Apr-2015
12:00 Noon
Chittagong
Up-gradation of Jhenidah District Hospital from 100 to 250 Bed at Jhenidah District. Executive Engineer, Jhenidah PWD Division, Jhenidah. 25-Mar-2015 28-Apr-2015
12:00 AM
Jhenaidah
Earth work, Brick work, machine made brick work, RCC work, tiles, deformed bar reinforcement, wooden door, grill, cement plaster, lime terracing, sanitary and water supply works, RCC Boundary wall Deep tube well, under ground water reservoir etc. Narayangonj PWD Division, Narayangonj 25-Mar-2015 09-Apr-2015
12:00 PM
Narayanganj
Construction of drain from Post office mour to Nabaganga River via HSS Sarak at ch. 00 - 1230 m including 7 Nos Cross drain atCh.0+02m,Ch.0+18m,Ch.0+397m,Ch.0+579m,Ch.0+702m,Ch.0+885m & Ch.1+030m Ward no - 06 under Jhenaidah Pourashava ( D1). Saidul Karim Mintu 25-Mar-2015 07-Apr-2015
01:00 PM
Jhenaidah
Repair,renovation and extension work in selected Govt. educational institutions.. Executive Engineer, EED, Faridpur Zone 25-Mar-2015 08-Apr-2015
01:00 PM
Faridpur
Repair,renovation and extension work in selected non Govt. educational institutions.. Executive Engineer, EED, Faridpur Zone 25-Mar-2015 02-Apr-2015
12:00 PM
Faridpur
Constraction of Passenger Wating shed, Land development, Parking yard, R.C.C boundary wall, Shaded walkway and allied with other works at Elisha Ferry Ghat under Barisal Division. Bangladesh Inland Water Transport Authority (BIWTA). 25-Mar-2015 16-Apr-2015
12:00 PM
Dhaka
Earth Filling work for Site Development of entire area at Satkhira Medical College & Hospital Campus, Palashpole, Satkhira. Chief Engineer, Health Engineering Department, Ministry of Health and Family Welfare. 25-Mar-2015 16-Apr-2015
01:00 PM
Satkhira
Construction of Road & Drain Executive Engineer, Dohar Pourashava, Joypara, Dohar, Dhaka. 25-Mar-2015 21-Apr-2015
01:00 PM
Dhaka
(i) Remaining Works for Upgradation of Mohangonj Upazila Health Complex from 31 Bed to 50 Bed in Netrokona District [Package No. W235N-CMMU] Chief Engineer, Health Engineering Department, Ministry of Health and Family Welfare. 25-Mar-2015 23-Apr-2015
12:30 PM
Netrokona
Up-gradation of Light & Sound show at Lalbagh Fort. Project Director, Department of Archaeology, Dhaka. 25-Mar-2015 15-Apr-2015
12:30 PM
Dhaka
Repair and Renovation works for Govt. College and School at Lalmonirhat District. Executive Engineer, Education Engineering Department, Kurigram Zone, Kurigram . 25-Mar-2015 13-Apr-2015
01:00 PM
Kurigram
h‡kvi †Rjvv f¤¢mn m¡C­e V¡Cf-1 Ae¤k¡u£ 6 am¡ ¢ia ¢h¢nø 2 (c¤C) am¡ j¢qm¡ hÉ¡l¡L ¢ejÑ¡Z (¢p¢im, pÉ¡¢eV¡l£ J °hc¤É¢aL) KvR| Executive Engineer, Jessore PWD Division, Jessore. 25-Mar-2015 06-May-2015
01:00 PM
Jessore
Constructon of Accommodation for 1 X 1200 Cadets (8 storey with 8 storied foundation) including ancillary works for BMA Bhatiary, Chittagong (1st Phase). DW & CE (Army), Dhaka Cantt. 24-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Constructon of 1 X Brigade HQ including ancillary works for 17 inf Division at Sylhet Cantt (GP-II) DW & CE (Army), Dhaka Cantt. 24-Mar-2015 16-Apr-2015
12:00 PM
Dhaka
Construction of 10- storied residential flat Building for middle income group of people at Jessore (Sub-head:-Supply,installation, testing & commissioning of 08 Nos (8 passenger,10-stop,630Kg) lift (For Building No-05,07,13 & 14). Executive Engineer, E/M Division, National Housing Authority, Segunbagicha, Dhaka. 24-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Construction of Academic building. Executive Engineer, EED, Barisal Zone, Barisal. 24-Mar-2015 13-Apr-2015
01:00 PM
Barisal
Construction of (i) Harinmara Dusri Khal Rubber Dam (25.00m x 3.00m), (ii) Pump House (iii) Rubber Dam Connecting Foot Bridge, (iv) WMCA Office ( 12.0m x6.0m) including Rain Water Harvesting Electrification, Supply of Office Furniture of WMCA Office under Harinmara Dusri Khal Subproject { SP-45151 (ADB)} Upazila:Ukhiya, District Cox’s Bazar. Executive Engineer 24-Mar-2015 28-Apr-2015
12:00 PM
Cox's Bazar
Upgradation of Natore District Hospital from 100 to 250 Bed at Natore District (Sub Head: Hospital Building civil work, internal and external sanitary and water supply, internal and external electrification and other electromechanical works, etc) Executive Engineer, Natore PWD Division, Natore. 24-Mar-2015 05-May-2015
12:00 Noon
Natore
Construction of Boundary Wall under “Establishment of Gournadi Textile Institute” Project at Barisal. Executive Engineer, Barisal PWD Division, Barisal. 24-Mar-2015 08-Apr-2015
12:00 Noon
Barisal
N/A Executive Engineer, Lakshmipur PWD Division, Lakshmipur 24-Mar-2015 30-Mar-2015
12:00 PM
Lakshmipur
(i) Improvement of Dhakhinpara hat under Gabtali Upazila & (ii) Improvement of Karamja hat under Sonatola Upazila, District: Bogra "Md. Naim Uddin Miah, Executive Engineer, LGED, Bogra. 24-Mar-2015 21-Apr-2015
01:00 PM
Bogra
Rehabilitation of 25 Nos. MG Passenger Carriages (Without Bogies Project Director & Divisional Superintendent (Workshop), Bangladesh Railway, Saidpur, Nilphamari 24-Mar-2015 20-May-2015
11:00 AM
Nilphamari
Construction of Fire service & civil defence station (B-Type) at 156 important Upazilla/ places of the Country one at Saltha, Faridpur (Civil ,Sanitary & Electrical works) during the year 2014 - 2015 . Executive Engineer, Faridpur PWD Division, Faridpur 24-Mar-2015 22-Apr-2015
12:00 Noon
Faridpur
Improvement of Dhaki UP Office-Katkhal UP Office Road at ch.00-2000m, with 8nos U-drain at ch.110m, 440m, 580m, 970m, 1230m, 1430m, 1690m, & 1880m under Mithamoin Upazila, District: Kishoreganj (ID No-348593002). Executive Engineer 23-Mar-2015 08-Apr-2015
01:00 PM
Kishoreganj
Construction of Thana Campus Road, RCC Drain etc. Assistant Engineer, Shibchar Pourashava. Madaripur 23-Mar-2015 20-Apr-2015
1:00 PM
Madaripur
Construction of Road. Laksam Pourashava. LGED. 23-Mar-2015 20-Apr-2015
01:00 PM
Thakurgaon
Construction of 14 (Fourteen) storied Residential Flats Building for selling to the low & middle income group of people at Section-9, Mipur, Dhaka. Executive Engineer, Dhaka Division-1, National Housing Authority, Section-2, Mirpur, Dhaka. 23-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Construction of 1× Bridge HQ including ancillary works for 17 Inf Division at Sylhet Cantt (GP-II) DW & CE (Army), Dhaka Cantt 23-Mar-2015 08-Apr-2015
12:00 PM
Dhaka
Provisionof Central Sewerage system at Dhamalkot area, Dhaka Cantt (GP-II) DW & CE (Army), Dhaka Cantt 23-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Construction of 1× 152 ''C''/''D'' type Qtr (20 storey with 20 storied foundation with basement floor, Car parking & other facilities in basement floor & ground floor) including ancillary works for 17 Inf Div at Sylhet Cantt (1st Phase) DW & CE (Army), Dhaka Cantt 23-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Construction of 1× 26 ''A'' type Qtr (14 storey with 14 storied foundation, Car parking & other facilities in ground floor) including ancillary works at Staff Road area Dhaka Cantt (Last Phase) DW & CE (Army), Dhaka Cantt 23-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Providing Safe and Sustainable Water Supply Services to Baikuri RPWS Scheme at Baikuri Union under Satkhira Sadar Upazila of Satkhira District on Partnership with Private Sector Department of Public Health Engineering (DPHE) 22-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Providing Safe and Sustainable Water Supply Services to Aganagar RPWS Scheme at Aganagar Union under Bhairab Upazila of Kishorgonj District on Partnership with Private Sector Department of Public Health Engineering (DPHE) 22-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Construction of a 6 storied C-Type (C-2) residential building at Adamjee EPZ Superintending Engineer, Adamjee EPZ 22-Mar-2015 21-Apr-2015
12:00 Noon
Narayanganj
Construction of Academic building. Executive Engineer, EED, Barisal Zone. 22-Mar-2015 06-Apr-2015
1:00 PM
Barisal
Construction of RCC Internal Road at Shantahar CSD, Bogra Director General of food 22-Mar-2015 08-Apr-2015
01:00 PM
Dhaka
Civil, Sanitary , Water supply & Electrification Works etc. Executive Engineer, EED, Faridpur Zone 22-Mar-2015 13-Apr-2015
12:00 PM
Faridpur
(1) Construction of 4 Storied RCC frame structure academic Building with 4th storied foundation. (2) Construction of 4 Storied RCC frame structure Boys hostel with 4th storied foundation. (3) Construction of 3 Storied RCC frame structure Girls hostel with 4th storied foundation. Project Director, Establishmet of two ATI at Buncharumpur Upazila, Brahmanbaria District & Saturia Upazila, Manikgonj District, 6th floor, 3rd building, Khamarbari, Farmgate, Dhaka. 22-Mar-2015 21-Apr-2015
01:00 PM
Dhaka
Different B&R works of Bangladesh Army for the Financial year 2014-2015 (As per Sl. no. 15) DW & CE (Army), Dhaka Cantt 22-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Different B&R works of Bangladesh Army for the Financial year 2014-2015 (As per Sl. no. 15) DW & CE (Army), Dhaka Cantt 22-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
As Per Tender schedule. Executive Engineer, PWD E/M Division-2, Dhaka. 22-Mar-2015 02-Apr-2015
12:00 Noon
Dhaka
As Per Tender schedule. Executive Engineer, PWD E/M Division-2, Dhaka. 22-Mar-2015 02-Apr-2015
12:00 Noon
Dhaka
Construction of boundary wall cum retaining wall for Fenchugonj 230/132kV grid sub-station, Fenchugonj, Moulavibazar. Power Grid Company of Bangladesh Ltd. 22-Mar-2015 30-Mar-2015
11:00 AM
Kushtia
Carrying of 1,25,000 MT Urea Fertilizer in bag from Chittagong Port /Chittagong Port Area (A , B, C Point) / Chittagomg Port Outer Anchorage to different buffer & Factory`s Godowns. Bangladesh Chemical Industries Corporation (BCIC) 22-Mar-2015 13-Apr-2015
11:00 AM
Dhaka
Construction of Light House Building and Tower including supply and installation of related equipment at Payra Port. Payra Port Authority 22-Mar-2015 09-Apr-2015
12:00 PM
Patuakhali
Up-gradation of Jhenidah District Hospital from 100 to 250 Bed at Jhenidah District. Executive Engineer, Jhenidah PWD Division, Jhenidah. 22-Mar-2015 28-Apr-2015
12:00 AM
Jhenaidah
Repair and Renovation works for Govt. College and School at Kurigram District. Executive Engineer, Education Engineering Department, Kurigram Zone, Kurigram . 22-Mar-2015 06-Apr-2015
01:00 PM
Kurigram
Vertical Extension of Engineering Building (2nd Floor), Horizontal Extension Civil Engineering Building Vice-Chancellor, KUET, Khulna. 22-Mar-2015 13-Apr-2015
12:00 PM
Khulna
Construction of Academic Building Executive Engineer, Education Engineering Department, Chittagong Zone. 22-Mar-2015 31-Mar-2015
1:00 PM
Chittagong
Re-excavation of Khas Khal/Khari including water body by excavator machine. Executive Director, Head Office, BMDA, Rajshahi. 22-Mar-2015 02-Apr-2015
12:00 PM
Rajshahi
Construction of 3-Class room academic building with 4-storied foundation in/c. Sanitary, Water supply, & Electrification works at Selected Educational Institution. (Lot No. 01 to 06.) Executive Engineer, Education Engineering Department, Noakhali Zone. 22-Mar-2015 30-Mar-2015
01:00 PM
Noakhali
Vertical extension of existing building to Non-Govt. Educational Institutions situated in Rangpur District Executive Engineer, Education Engineering Department, Rangpur Zone, Rangpur. 22-Mar-2015 02-Apr-2015
01:00 PM
Rangpur
Construction of Fire Service & Civil Defence Stations in 156 important Upazilla/Places of the Country one at Moheshpur Fire Station in the District of Jhenidah (Civil, Sanitary & Electrifications works). Executive Engineer, Jhenidah PWD Division, Jhenidah. 22-Mar-2015 20-Apr-2015
12:00 PM
Jhenaidah
Road along with drain development work of Mitford Road. Executive Engineer, Zone-4, DSCC 19-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Remaining works for Upgradation of Upazila Health Complex from 31 to 50 Bed at Gangni Upazila in Meherpur District. Chief Engineer, Health Engineering Department, Ministry of Health and Family Welfare. 19-Mar-2015 20-Apr-2015
12:30 PM
Meherpur
Construction of Infrastructures for 3( Three ) District Jails & Completion of the Remaining Works of 02(Two) District Jails one at Kishoreganj. Executive Engineer, Kishoreganj PWD Division, Kishoreganj. 19-Mar-2015 16-Apr-2015
12:00 PM
Kishoreganj
Manufacturing & supply of Furniture to Selected Govt. & Non-Govt. Institutions. Executive Engineer, Education Engineering Department, Narsingdi Zone, Narshingdi. 19-Mar-2015 31-Mar-2015
1:00 PM
Narsingdi
Construction of Battalion Head Quarter Complex of Ansar & VDP ( 15 Executive Engineer, Rangamati PWD Division, Rangamati. 19-Mar-2015 20-Apr-2015
12:00 Noon
Rangamati
Construction of 6 storied Trainee’s Hostel with 6-storied foundation (Civil & Sanitary work) at National Maritime Institute, Chittagong. Executive Engineer, Chittagong PWD Division-III, C.G.O Building No-1, Agrabad, Chittagong. 19-Mar-2015 20-Apr-2015
12:00 PM
Chittagong
Construction of Vertical Extension of Existing Building at Md. Elias Ali Chowdhury High School, Sadar, Cox''s Bazar. Executive Engineer, Education Engineering Department, Cox’s Bazar Zone. 19-Mar-2015 09-Apr-2015
01:00 PM
Cox's Bazar
Manufacturing & Supplying of Furniture For Academic Building to Selected Government & Non-Government Educational Institutions. Executive Engineer, Education Engineering Department, Cox’s Bazar Zone. 19-Mar-2015 09-Apr-2015
01:00 PM
Cox's Bazar
Manufacturing Supply of Furniture . Executive Engineer , EED, Barisal. 19-Mar-2015 20-Apr-2015
01:00 PM
Barisal
Construction of RCC drain along the side of Nowzour to Zirani bazar road (from Nowour up to 2.00km) (ch. 00+000 to 01+960km). PIU office of the Gazipur City Corporation, Gazipur. 19-Mar-2015 20-Apr-2015
02:00 PM
Gazipur
Repairing & widening B/C road from Nowzour to Zirani bazar road (from Nowzour up to 2.00km) (ch. 00+000 to 02+000km). PIU office of the Gazipur City Corporation, Gazipur. 19-Mar-2015 20-Apr-2015
02:00 PM
Gazipur
Repair and Renovation Works of Non-Govt. Institutions. Executive Engineer, Education Engineering Department, Cox''s Bazar Zone. 19-Mar-2015 09-Apr-2015
01:00 PM
Cox's Bazar
(i) Improvement of Dhulazari hat under Debiganj upazila & (ii) Improvement of Tirnoi hat under Tetulia upazila, District: Panchagarh. Executive Engineer, LGED, Panchagarh 19-Mar-2015 16-Apr-2015
12:00 PM
Panchagarh
Repairing & widening of road from Mazukhan bazar to Meghdubi Bi-pass road via Kironartack Pubail by BC along with 1 box culvert size 10mx4.5m (ch. 0.00-2.55km). PIU office of the Gazipur City Corporation, Gazipur. 19-Mar-2015 20-Apr-2015
02:00 PM
Gazipur
Construction of Police Line Barrack Bhaban Executive Engineer PWD. Division, Moulvibazar. 18-Mar-2015 02-Apr-2015
12:00 Noon
Moulvibazar
Construction of 4-storied standard factory building (building no. MSSFB # 02) having foundation for 08 (eight) storied in Comilla EPZ. BEPZA 18-Mar-2015 20-Apr-2015
12:00 PM
Dhaka
Supply, Installation, Testing and Commissioning of Split Type Air Conditioning Units, Diesel Engine Generator Sets, Earthing etc for BTCL''s different District and Upazilla Exchanges Under UOFCNDP Project on Full Turn- Key Basis. Managing Director, BTCL 18-Mar-2015 31-Mar-2015
11:45 am
Dhaka
(1) Construction of Verticle Extention (2nd Floor) of Veterinary Teaching and Diagnostic Laboratory. (2) Construction of Verticle Extention (3rd & 4th floor) of Girls Hostel. Establishment of Jhenidah Government Veterinary College Project (2nd Phase), Jhenidah. 18-Mar-2015 08-Apr-2015
01:00 PM
Jhenaidah
Construction of Shimul Tower Building from 15th floor to 19th floor (only structural work i.e. column, beam, lintel, slab, stair, lift core etc) at Ramna Thana Complex, Dhaka. Executive Engineer, Dhaka PWD Division-1, Dhaka. 16-Mar-2015 07-Apr-2015
12:00 PM
Dhaka
Construction of Academic building. Executive Engineer, EED, Barisal Zone. 16-Mar-2015 06-Apr-2015
1:00 PM
Barisal
Construction of Poura Super Market. Mayor, Barguna Pourashava 16-Mar-2015 09-Apr-2015
2:00 PM
Barguna
Supply, Installation and Commissioning of new Plants & Machinery Chief Mechanical Engineer (East) & Project Director,Bangladesh Railway, Central Railway Building (CRB)Chittagong, Bangladesh 16-Mar-2015 14-May-2015
12:00 PM
Chittagong
Tender for Works Executive Engineer, Zone-5 (Sayedabad) 16-Mar-2015 13-Apr-2015
12:00 Noon
Dhaka
Renovation of Sheds, drainage system, roads, sinking deep tube-wells & installation of water tanks etc. of Pahartali Workshop Electrical Works i.e. Design, Supply, Installation & commissioning of sub-station, equipment viz. Transformer, HT switch, LT cable etc. & rewiring. Chief Mechanical Engineer (East) & Project Director,Bangladesh Railway, Central Railway Building (CRB)Chittagong, Bangladesh. 16-Mar-2015 30-Apr-2015
12:00 PM
Chittagong
Meter gauge Track rehabilitation of Pahartali Railway Workshop Chief Mechanical Engineer (East) & Project Director,Bangladesh Railway, Central Railway Building (CRB)Chittagong, Bangladesh. 16-Mar-2015 30-Apr-2015
12:00 PM
Chittagong
Construction of Battalion Head Quarter Complex of Ansar & VDP (15 Ansar Battalions in first phase) The Executive Engineer PWD. Division, Moulvibazar. 16-Mar-2015 08-Apr-2015
12:00 PM
Moulvibazar
Rehabilitation of 25 Nos. BG Passenger Carriages (Without Bogies) Project Director & Divisional Superintendent (Workshop), Bangladesh Railway, Saidpur, Nilphamari 15-Mar-2015 11-May-2015
11:00 Hrs
Dhaka
i) Lake excavation, Sludge removal and lake bank protection work from Gausul Azam Mosque to NAM village at Gulshan-Banani Lake (Lot-4), ii) Lake excavation, Sludge removal and Lake bank protection work Mohakhali Gulshan-1 Link Road to Tejgaon-Gulshan Link Road at Gulshan-Banani Lake (Lot-5) Chief Engineer (Implementation), RAJUK 15-Mar-2015 31-Mar-2015
12:30 PM
Dhaka
Vertical Extension of existing Academic building. Executive Engineer, Education Engineering Department Gopalgonj Zone,Gopalgonj. 15-Mar-2015 10-Apr-2015
01:00 PM
Gopalganj
Establishment of 5 Zonal and 4 Regional Office and Modernization and Strengthening the Department of Inspection for Factories and Establishments One at Faridpur.(S.H:- Construction of Office Building ) ( Civil,Sanitary & Electrification works). Executive Engineer, Faridpur P.W.D Division, Faridpur. 15-Mar-2015 06-May-2015
12:00 PM
Faridpur
Construction of Poura Super Market Mayor, Barguna Pourashava 15-Mar-2015 09-Apr-2015
02:00 PM
Barguna
i) Construction of 4th & 5th floor over existing 3rd floor of standard factory building no. 06 in Chittagong EPZ. Chittagong Export Processing Zone 15-Mar-2015 16-Apr-2015
12:00 PM
Chittagong
Construction of 100 Beded Boys Hostel Building including Sanitary, water supply & Electrification works at Rajbari Govt. College, Rajbari. Executive Engineer, EED, Faridpur Zone 15-Mar-2015 06-Apr-2015
01:00 PM
Rajbari
Establishment of hostel building for the visually impaired children (37 units) 01 (one) at Munshigonj ( Sub-Head Construction of 2 storied Building with 4 storied foundation including, Civil, Internal Sanitary, Internal Electrification, External electrification, Deep tube well with pump motor, Boundary wall etc. Munshigonj PWD Division, Munshigonj. 12-Mar-2015 30-Mar-2015
12:00 PM
Munshiganj
Construction of Boundary wall in Kaliakoir Hi-Tech Park (WD-6.1) Project Director, Support to Development of Kaliakoir Hi-Tech Park Project 12-Mar-2015 30-Mar-2015
02:00 PM
Dhaka
Procurement of Three Phase Whole Current Electronic Programmable Multi Tariff KWHr Meter Procurement Division, DESCO, Dhaka. 12-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
As stated in Sl. No.26 Executive engineer, LGED, Gaibandha 12-Mar-2015 21-Apr-2015
01:00 PM
Gaibandha
Repair, Renovation, Rehabilitation of Govt. Educational Institutions situated in Rangpur & Gaibandha District. Executive Engineer, Education Engineering Department, Rangpur Zone, Rangpur. 12-Mar-2015 31-Mar-2015
1:00 PM
Rangpur
(a) Repairing & widening of road by BC from Bonomala Rail gate to Dhaka Mymensing connecting road at college gate (ch. 0.00-ch. 1425.00m).(b) Repairing & widening of Bonomala Sayed Mridha connecting road by BC to Pubail connecting road behind Tongi Thana (ch. 0.00m-ch. 2050.00m). PIU office of the Gazipur City Corporation, Gazipur. 12-Mar-2015 20-Apr-2015
02:00 PM
Gazipur
Lot I(One): Construction of 1000.00 Sft S.I. Quarter 2nd and 3rd floor (over existing Ist floor) at Begumgonj Police Station Compound in the District of Noakhali. During the year 2014-2015.Lot 2 (Two): Construction of 800.00 Sft A.S.I. Quarter / Constable Quarter 2nd and 3rd floor (over existing Ist floor) at Begumgonj Police Station Compound in the District of Noakhali. During the year 2014-2015. Executive Engineer, PWD Division, Noakhali. 11-Mar-2015 31-Mar-2015
12:00 PM
Noakhali
1000mA Digital Radiography System with Dual Flat Panel Detector Director, Sheikh Fazilatunnessa Mujib Eye Hospital & Training Institute, Gopalgonj. 11-Mar-2015 04-Apr-2015
12:00 PM
Gopalganj
Construction of 448 nos. flats for Gvt. employees of Bangladesh National Parliament secretariat (inclusive of 24 nos earmarked for pwd) at sher-e-bangla nagar, Dhaka. Executive Engineer, PWD E/M Workshop Division, Dhaka 11-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Computer Spare Parts & Related Services, Liveries, Medicine and Medical Equipment, Re-agent & Chemicals. Bangladesh Parliament Secretariat 11-Mar-2015 01-Apr-2015
12:00 PM
Dhaka
Repair, Renovation, Rehabilitation of Govt. Educational Institutions situated in Rangpur & Gaibandha District. Executive Engineer, Education Engineering Department, Rangpur Zone, Rangpur. 11-Mar-2015 31-Mar-2015
01:00 PM
Rangpur
REPAIR OF JETTY AND OTHER RELATED WORKS AT DAULATPUR DEPOT, KHULNA MEGHNA PETROLEUM LIMITED(A Subsidiary of Bangladesh Petroleum Corporation) 10-Mar-2015 31-Mar-2015
03:00 PM
Chittagong
Sinking and Commissioning of 450mmX200mm dia 3 (Three) Nos. (1 New & 2 Replacement) DTW at any places of Dhaka City including all related works and supplying all necessary materials. Dhaka Water Supply and Sanitation Project 09-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Sinking and Commissioning of 450mmX200mm dia 3 (Three) Nos. (1 New & 2 Replacement) DTW at any places of Dhaka City including all related works and supplying all necessary materials. Dhaka Water Supply and Sanitation Project 09-Mar-2015 31-Mar-2015
12:00 PM
Dhaka
Sinking and Commissioning of 450mmX200mm dia 3 (Three) Nos. (1 New & 2 Replacement) DTW at any places of Dhaka City including all related works and supplying all necessary materials. Dhaka Water Supply and Sanitation Project 09-Mar-2015 01-Apr-2015
12:00 PM
Dhaka
Vertical Extension of 2nd floor over the existing 1st floor of Nari Police Dormitory Bldg. in Sylhet District ( Civil, Internal Sanitary & Internal Electrification works) during the year : 2014-2015. Executive Engineer, PWD Division, Sylhet. 09-Mar-2015 02-Apr-2015
12:00 PM
Sylhet
Construction of 3 (Three) Class Room Academic Building with 4 - Storied Foundation including Sanitary, Water Supply & Electrification works at Selected Educational Institutions. Executive Engineer, Education Engineering Department, Kushtia Zone,Kushtia. 09-Mar-2015 31-Mar-2015
01:00 PM
Kushtia
Construction of 3 class room Academic Building with 4-Storied foundation including Sanitary, Water supply & Electrification works at selected Educational Institution. Executive Engineer, Education Engineering Department, Bogra Zone, Bogra 09-Mar-2015 30-Mar-2015
12:00 PM
Bogra
Construction of 1(one) Production tube well, Piped rural water Supply and Related work for Rajgonj Bazar, Upazila: Monirampur, District: Jessore Executive Engineer 09-Mar-2015 02-Apr-2015
01:00 PM
Jessore
Construction of 3 (Three) Class Room Academic Building with 4 - Storied Foundation including Sanitary, Water Supply & Electrification works at Selected Educational Institutions. Executive Engineer, Education Engineering Department, Kushtia Zone, Kushtia. 09-Mar-2015 31-Mar-2015
01:00 PM
Kushtia
Package-WD5(A) : Balance works of Repair/ reconstruction/ construction of Bridge works in Sholosahar-Dohazari section including supply of all required materials & equipments, labor & transportation. Project Director, Rehabilitation of Sholasahar-Dohazari and Fateabad-Nazirhat section including other allied works, Bangladesh Railway, Chittagong. 09-Mar-2015 16-Apr-2015
12:00 PM
Chittagong
Package : WD-01/Railing/2014-15Construction of Decorative Railing on IsLand starting from Greater road Bornali mour to Bilsimla mour and Arif foll Vander to Sahid A. H. M. Kamaruzzamn Chottor. Mayor, Rajshahi City Corporation 09-Mar-2015 02-Apr-2015
01:00 PM
Rajshahi
(i) Construction of Retaining wall, External Electrification & Re-excavation of Pond (Package No. WD. 18)(ii) Construction of Boundary wall (Package No. WD. 19)(iii) Construction of Office cum Dormitory Building (Package No. WD. 20)(iv) Construction of Hatchery Building (Package No. WD. 21)(v) Construction of Overhead Water Tank & Water Supply Line (Package No. WD. 22)(vi) Site Development (Package No. WD. 23) Project Director, Greater Faridpur Fisheries Development Project, Department of Fisheries, Gopalganj. 09-Mar-2015 05-Apr-2015
12:00 PM
Gopalganj
Construction of Khudro Nri-Goshti Cultural Academy with 350 Seated Auditorium/Multipurpose Hall at Haluaghat, Mymensingh. Sub-Head : Construction of Office and Auditorium building, Internal Sanitary & Internal Electrification works. F.Y. 2014-2015. Executive Engineer, PWD Division, Mymensingh. 08-Mar-2015 08-Apr-2015
12:00 PM
Mymensingh
Construction work(Civil,Sanitary Electricat) Executive Engineer,Education Engineering Department ,Madaripur Zone. 08-Mar-2015 30-Mar-2015
12:00 PM
Madaripur
Construction of Drain & Slaughter house Mayor, Mymensingh Pourashava 08-Mar-2015 06-Apr-2015
01:00 PM
Mymensingh
FLIGHT INSPECTION AND CALIBRATION OF RADIO NAVIGATION AIDS INSTALLED AT DIFFERENT AIRPORTS OF BANGLADESH. Director, CEMSU, CAAB, Kurmitola, Dhaka 08-Mar-2015 13-Apr-2015
12:00 PM
Dhaka
Construction of 2 (two) storied women Police Barrack as type -2, with 6 (six) storied foundation at Police Line, Lalmonirhat (Including Civil, Sanitary & Electrification works.) during the year-2014-2015. Executive Engineer PWD Division, Lalmonirhat. 08-Mar-2015 31-Mar-2015
12:00 PM
Lalmonirhat
Dalal Bazar N.K High School.Radhapur High School,Chandkhali Islamia Dakhil Madrasha. Executive Engineer, Education Engineering Department, Lakshmipur Zone, Lakshmipur. 05-Mar-2015 31-Mar-2015
01:00 PM
Lakshmipur
Establishment of Fire Service & Civil Defense Stations in 156 important Upazilla/Places of the Country, one at Dhubaura Upazilla in the District of Mymensingh. (Sub-Head: (a) Functional Building in/c internal sanitary & electrification, (b) Kitchen cum Dining, (c) External water supply, (d) External Electrification, (e) Compound & Surface Drain, (f) Compound Road, (g) Boundary wall, (h) Site Development, (i) Flag Stand, (j) Fuel shed. Executive Engineer, PWD Division, Mymensingh. 05-Mar-2015 31-Mar-2015
12:00 PM
Mymensingh
Construction of Single Storied Academic building with 4-storied foundation in/c Sanitary,Water supply & Electrification works. Executive Engineer, Education Engineering Department, Gopalgonj Zone,Gopalgonj. 05-Mar-2015 31-Mar-2015
01:00 PM
Gopalganj
Civil, Sanitary, Water supply and Electrification works. Executive Engineer, Education Engineering Department, Chandpur Zone,Chandpur. 05-Mar-2015 01-Apr-2015
01:00 PM
Chandpur
Turn-key contract for Design, Supply, Construction, Installation, Testing & Commissioning Of 33KV GIS Indoor Type Sub-Station, 3 storied Control Room, 2 Nos. Incoming,1 No. Bus Section, 12 Nos. Outgoing 33 KV Feeder, cable trenches and Associated Works on Turnkey Basis At Bhulta. (Near Bhulta 132/33KV, 2X50/75 MVA Grid Sub-Station) Bhulta, Rupgonj under Narayangonj PBS. Superintending Engineer (Grid & Sub-Station), Bangladesh Rural Electrification Board, Dhaka. 04-Mar-2015 01-Apr-2015
12:00 PM
Dhaka
Construction of 3 Class room Academic Building with 4-Storied Foundation including Sanitary Executive Engineer, Education Engineering Department, Rajshahi Zone, Rajshahi. 04-Mar-2015 30-Mar-2015
01:00 PM
Rajshahi
Road and Drain Works Executive Engineer, Jessore Pourashava, Jessore 04-Mar-2015 08-Apr-2015
01:00 PM
Jessore
Construction of 1(one) Production tube well, Piped rural water Supply and Related work for Rajgonj Bazar, Upazila: Monirampur, District: Jessore Executive Engineer, LGED, Jessore 04-Mar-2015 02-Apr-2015
01:00 PM
Jessore
Road works Executive Engineer ,LGED ,Patuakhali 02-Mar-2015 31-Mar-2015
01:00 PM
Patuakhali
Construction of 1000 seats Anima Chowdhury Auditorium Cum Community Center at Natore Sadar upazila,District natore Office of the Chief Executive Officer,Zila Parishad Natore 02-Mar-2015 31-Mar-2015
01:00 PM
Natore
Remaining work for Establishment of 30(Thirty) Technical Traning Centers (TTC) in Different Distructs, one at Gaibandha (Sub-Head: Construction of 4-Storied Dormitory Building with 6-Storied Foundation,including Civil,Internal Sanitary and Internal Electrification)under PWD. Division, Gaibandha.FY-2014-2015 Eng. Executive Engineer, Gaibandha PWD Division, Gaibandha. 02-Mar-2015 31-Mar-2015
12:00 PM
Gaibandha
Construction of Six Storied B-Type (B-03) Residential Building at Uttara EPZ; Construction of a Six Storied D-Type (D-03) Residential Building at Uttara EPZ Executive Engineer (Civil) Uttara EPZ, Nilphamari 01-Mar-2015 30-Mar-2015
12:00 PM
Nilphamari
Establishment of Institute of Health Technology (IHT) at Munshigonj District. Health Engineering Deprtment (HED), Ministry of Health and Family Welfare 01-Mar-2015 31-Mar-2015
01:00 PM
Dhaka
Improvement of Bujurgikona Bazar-Baro Dakhinpara via Wapda hat road at Ch. 0.00-2000m by E/W+25mm Carpeting+7mm Seal Coat & 1 vent 4.00×4.00×4.66m Box Culvert under Kotalipara Upazila (Road ID No. 335515030). Executive Engineer, LGED, Gopalganj 01-Mar-2015 30-Mar-2015
12:00 PM
Gopalganj
Construction of 03 storied Security Barrack # 02 having six storied foundation at Uttara EPZ. Executive Engineer (Civil), Uttara EPZ, Nilphamari. 01-Mar-2015 06-Apr-2015
12:00 PM
Nilphamari
Tender of 02 no sub-project: Development of Roads and Construction of RCC Drains. Mayor, Sherpur Pourashava. 01-Mar-2015 31-Mar-2015
02:00 PM
Sherpur
Construction of 10 (ten) storied Modern Supper Market Cum Multipurpose Commercial Building for Tangail Central Co-operative Bank Ltd. at Old Adalot Road, Tangail (Phase-1). Chairman, Tangail Central Co-operative Bank Ltd 01-Mar-2015 31-Mar-2015
12:00 PM
Tangail
Construction of boundary wall & land development Superintending Engineer , Bangladesh Land Port Authority, T.C.B. Bhaban (5th Floor), 1 Kawran Bazar, Dhaka. 01-Mar-2015 30-Mar-2015
12:00 PM
Dhaka
Construction of Shaheed Lt. Commender Moazzam Hossain Community Center at Dhaka. Senior Assistant Engineer, Zilla Parishad, Dhaka. 26-Feb-2015 08-Apr-2015
12:00 PM
Dhaka
Construction of 4-storied standard factory building (building no. MSSFB # 02) having foundation for 08 (eight) storied in Uttara EPZ. Bangladesh Export Processing Zones Authority (BEPZA) 26-Feb-2015 02-Apr-2015
12:00 PM
Dhaka
Construction of a Three Storied Officers dormitory with six storied foundation at Uttara EPZ Executive Engineer (Civil), Uttara EPZ, Nilphamari. 26-Feb-2015 01-Apr-2015
12:00 PM
Nilphamari
Construction of 5-storied 100 Bedded female hostel bldg. with 5-storied foundation in/c sanitary & electrification work''s at Cox''s bazar govt. women College under sadar Upazila, cox''s bazar district. Executive Engineer, EED, Dhaka 25-Feb-2015 30-Mar-2015
01:00 PM
Dhaka
(i) Improvement of Shipaiganj hat under Sayedpur upazila, (ii) Improvement of Dugdugi Boroghcha hat under Domar upazila, (iii) Improvement of Babrijhar GC under Sadar upazila (iv) Improvement of Chapani hat under Dimla upazila & (v) Improvement of Gragram hat under Kishoregonj upazila XEN,LGED,Nilphamari 25-Feb-2015 07-Apr-2015
01:00 PM
Nilphamari
Land Development by earth/sand RAJUK. 25-Feb-2015 30-Mar-2015
12:00 PM
Dhaka
Tender of Pre-Payment Metering Project for Distribution Southern Zone, Chittagong (Phase-1) on turnkey basis Bangladesh Power Development Board 23-Feb-2015 16-Apr-2015
10:30 AM
Dhaka
Renovation / Remodeling of Mymensingh Medical College & Hospital (Sub Head : Hospital Building , Academic Building and Hostel Building , Retrofitting etc, Internal and external Sanitary and water supply ,Internal and external electrification and other ancillary works etc.) Executive Engineer, PWD Division, Mymensingh. 22-Feb-2015 30-Mar-2015
12:00 PM
Mymensingh
Lease for KCC Hat, Bazar for the year 1422 Bangla Mayor, Khulna City Cororation 19-Feb-2015 09-Apr-2015
01:00 PM
Khulna
Construction of a 2(two) storied mosque having foundation for 4(four)-storied in residential area at Adamjee EPZ. Executive Engineer (Civil) & Head of the Department, Adamjee EPZ. 15-Feb-2015 30-Mar-2015
12:00 PM
Narayanganj
Supply, Installation, Testing & Commissioning of a (01 No) Digital Cinema Projector on Turnkey basis & on site training. Vice Chairman, Bangladesh Film Censor Board 09-Feb-2015 16-Apr-2015
03:00 PM
Dhaka
Procurement of 02 Nos of rail mounted dock/portal crane (capacity min 5-6 M. Ton) with spare parts, tools, accessories and other related services for Mongla Port Authority. Chief Engineer (Mechanical & Electrical) 08-Feb-2015 02-Apr-2015
12:00 PM
Bagerhat
Engaging Operator for Operation and Maintenance (O&M) of the Bangabandhu Bridge and Associated works for 5 (Five) Years. Chief Engineer, Bangladesh Bridge Authority 08-Jan-2015 09-Apr-2015
12:00 PM
Dhaka
Design, Supply, Installation, Testing and Commissioning of 12 nos new 2x20/26MVA, 33/11KV GIS substation, 2 nos of new 1x10/13.33MVA 33/11 KV AIS Substation, Renovation of 04 Nos 33/11 KV Substation and Upgradation of 04 Nos 33/11 KV Substation on Turnkey Basis Under power Distribution System Development Project, Chittagong Zone BPDB, Chittagong. 05-Jan-2015 30-Mar-2015
11:00 AM
Chittagong
Executive Engineer, PWD Division, Norail. 21-Aug-2014
Narail
Construction of 211.74m Long RCC Girder bridge on Bhangura – Noagaon GCM road at Ch: 10860m [Bhangura] Executive Egnineer, LGED, Pabna 23-Sep-2013 29-Oct-2019
12:00 PM
Pabna
Construction of 120.00m Long RCC Girder bridge on Bhangura – Noagaon GCM road at Ch: 6860m [Bhangura] Executive Egnineer, LGED, Pabna 23-Sep-2013 29-Oct-2019
12:00 PM
Pabna
Supplying of stone chips, pea-Gravels, 1st class P/A brick bats local sand (F.M.0.50) & fire wood for repairing the road surface & flanks of different road under road sub-division, comilla during the year 2008-2009. RHD, Road Division Comilla 30-Oct-2008
Comilla
 
 SERVICES
  TitleProcuring EntityIssue DateClosingPlace
EOI ( for Short Listing of consulting Engineering Farm) Well experienced reputed Architectural Engineering Consulting Farms. Project Director, Establishment of Institute of Livestock Science & Technology Project 04-Mar-2015 02-Apr-2015
03:00 PM
Dhaka
 
 
     

FAQ's      Downloads      Contact & Feedback      Email Subscription      Forum      Site Map